arrow_back Volver a las freelances
F

Hospitality Operations Consultant- Build a Hotel Operating System managed by Virtual Assistant and Site Manager

Freelancer

Compartir:
placeUS home_workRemoto assignmentPor contrato publicEmpleo agregado · US

eventPublicado el 02 sept 2026 · verifiedConfirmamos el 02 sept 2026 que sigue activo

US$ 3.000 – US$ 5.000 por proyecto

Sobre el empleo

We are repositioning an approximately 60-room Branson motel for workforce, extended-stay, employer-account, Airbnb, and nightly guests. We need a hotel operations consultant to build a low-labor system where VAs handle most GM and front-desk duties. On-site staff will handle housekeeping, inspections, basic maintenance, lockouts, emergencies, vendor access, and physical tasks. ## Scope The consultant will: * Design the VA operating model, responsibilities, and escalations * Select, configure, integrate, and test the PMS, booking engine, channel manager, payments, guest communications, smart locks, maintenance, revenue management, employer accounts, and reporting * Design camera, security, internet, cybersecurity, access-control, and outage procedures; coordinate installation and testing with local vendors * Establish nightly, weekly, employer, Airbnb, and other channel procedures * Build pricing, accounting-control, reconciliation, collections, employer-sales, and reporting systems * Build housekeeping, laundry, inspection, maintenance, inventory, incident, emergency, licensing, and continuity systems * Create SOPs, scripts, checklists, job descriptions, and management reports * Train the initial VA and on-site teams, test the operation, and support the first 30 days * Define requirements for a separate Notion consultant and verify the dashboard supports hotel operations ## Required Experience * Hotel, motel, or extended-stay opening/repositioning * Remote operations or virtual front desks * Direct PMS and hotel-technology implementation * Workforce, weekly-stay, or employer-account experience * SOPs, training, and launch testing ## Application Provide similar properties, room counts, systems implemented, results, two references, start date, duration, approach, fixed fee, and duties that cannot be remote. # Fixed-Price Milestones ## Payment Rules * Only Milestone 1 is funded in Freelancer escrow at the start. * Later milestones are funded one at a time after the previous milestone is accepted. * Funding does not mean acceptance or payment earned. * Payment is released only after required work is delivered, demonstrated, corrected, and approved in writing. * No advance. Time or a payment request does not constitute acceptance. ## Milestone 1: Paid Trial and Validation—10%, Maximum $300 **Deadline:** Five business days after kickoff. * Kickoff and discovery meeting * Review the property, guests, VA model, on-site staffing, and objectives * Identify the 15 most important gaps or risks affecting opening, safety, revenue, or remote operations, including security, life safety, IT, finances, staffing, and continuity * Rank each Critical, Important, or Later and state the solution, responsible party, and deadline * Draft the end-to-end workflow and identify duties that can and cannot be handled remotely * Provide preliminary technology/security recommendations, schedule, and required information, accounts, decisions, vendors, and access * Live screen-share demonstrating practical PMS knowledge Work must be property-specific. Generic material without operational substance will not be accepted. After Milestone 1, the client may continue or terminate. If terminated, only the accepted Milestone 1 payment is owed. ## Milestone 2: Operating Blueprint and Technology—15% **Deadline:** Five business days after Milestone 1 acceptance. * Complete operating map covering reservations, pricing, payments, screening, check-in, access, cameras, security, communications, housekeeping, laundry, maintenance, employer accounts, incidents, emergencies, continuity, and reporting * Final responsibility and escalation matrix * Technology comparison and selections with costs, limitations, integrations, and implementation requirements * Camera/security plan covering coverage, remote access, retention, alerts, permissions, video export, failure alerts, and backup power/internet * IT plan covering primary/backup internet, Wi-Fi, separate guest, staff, camera, and lock networks, cybersecurity, MFA, passwords, and outages * Revenue plan for nightly, weekly, seasonal, employer, Airbnb, and other channel rates and inventory * Accounting controls for reconciliation, OTA payouts, deposits, refunds, chargebacks, employer billing, taxes, and reporting * Employer-sales process for leads, room blocks, contracts, credit, billing, and collections * Opening-compliance tracker for licenses, taxes, tourism requirements, alarms, inspections, life safety, insurance, vendors, and responsible parties * On-site response standards and final implementation schedule Every major function must be assigned to a person or system. A general software list is insufficient. ## Milestone 3: Systems Configured and Tested—25% **Deadline:** Ten business days after Milestone 2 acceptance. * Configure selected systems in client-owned accounts * Configure PMS, booking engine, channel manager, payments, communications, smart locks, revenue management, employer accounts, reporting, and maintenance * Enter rooms, rates, fees, taxes, deposits, policies, rules, permissions, and automated messages * Configure direct booking, Airbnb, and applicable channels * After local installation, configure camera remote access, retention, alerts, permissions, playback, export, and failure alerts * Coordinate and test primary/backup internet and separate guest, staff, camera, and lock networks * Configure MFA, password management, access levels, and integrations * Deliver administrator credentials and demonstrate the system **Required test:** A test guest must book, pay, check in, receive access, submit a request, extend, check out, trigger housekeeping, and appear in management/accounting reports. Test an employer booking and billing. Cameras must demonstrate remote viewing, recording, playback, export, permissions, alerts, and offline notification. Payment is released after successful testing and correction of material errors within the consultant's control. ## Milestone 4: SOPs

Sigue leyendo gratis

Crea una cuenta gratis para ver el empleo completo y postularte.

  • badgePortafolio visible para las empresas
  • notificationsAlerta de empleo nuevo por correo
  • favoriteSiempre gratis, sin trampas