Pubblicata il 31 ago 2026 · Abbiamo verificato il 31 ago 2026 che è ancora attiva
₹ 1.500 – ₹ 12.500 per progetto
The shocker-testing machine on my line already has a full SCADA package in place, yet it keeps dropping communication with its PLC, attached sensors, and actuators. The HMI screens load fine, but tags freeze, commands fail to reach the field devices, and alarms flood the log. I need the existing project inspected, its driver or protocol stack corrected, and the link restored to rock-solid reliability—no redevelopment from scratch, just a clean, well-documented fix. Scope of work • Audit the current SCADA project, driver settings, and network configuration. • Pinpoint the root cause of the PLC, sensor, and actuator comms failures. • Implement and test the corrective actions so data reads accurately and control writes execute every cycle. • Supply a brief technical report summarizing findings, changes, and proof-of-run. Acceptance criteria A continuous eight-hour production run with zero lost packets, frozen tags, or mismatched data will signal success. You’ll receive the project files, PLC tag list, and VPN access as soon as we agree.
Crea un account gratuito per vedere l'offerta completa e candidarti.